Steps to oversee the implementation of projects- buildings 3

Ceilings and beams:
1 - Review and receive the wrenches to the Bishop (D - elevations - strengthening and consolidation _ sewer extensions to the work of the electrical and plumbing and mechanical).
2 - Review and receive reinforcement in accordance with the plans and schedules reinforcement.
3 - Bishop Alhorda take into account the review and receipt of the opportunities and the dimensions of nerve blocks and beams.
4 - Adoption of the concrete mix and give permission to the contractor to pour.
5 - oversee the process of casting and check: - textures - mechanical shaking - concrete cover - Surface finish - samples and tests, taking into account not casting at infrequent intervals.
6 - Verification of concrete treatment for the period specified in accordance with the specifications.
7 - to give ear to the contractor Remove formwork beams of the roof and after the times specified, and verify the absence of defects.
Building works:
1 - Adoption of samples of materials to specifications.
2 - Verification of material supplied to the site in accordance with the approved samples.
3 - Adoption of cement mortar mix of buildings.
4 - Check and make sure to follow the technical assets in buildings.
5 - receipt of the building works in accordance with the plans (dimensions - vertical - horizontal - Strengthening Shabaks buildings - the dimensions of holes and elevations).
6 - Review of any extensions of the work (health - Electrical - Mechanical - etc.) during construction and to ensure isolation of appropriate material.
7 - check the water treatment building works for the period specified in accordance with the specifications.