Receipt of carpentry

A: Receive carpentry rules and foundations of reinforced concrete:

1. Structural matching themes with architectural themes and the health of the signing of the angles as graphics.
2. Sure of the rules match the axes with the correct spatial axes.
3. Review the dimensions of the rules, rises.
4. Review Altagafil good with some aspects of the rules and pay the openings between the panels.
5. Review places to install bolts or pallet, if any.
6. Review places openings and pathways, electricity, health ... etc..
7. Make sure the installation of cookies between the sides of the base and reinforcing iron rules.
8. Review and make sure Altqoyat completed correctly and durability.

B: Receive joinery reinforced concrete columns:

• Before Altagafil and Relay:
1. Review vertical axes with the axes origin.
2. Axes of the columns match with the architectural construction.
3. Sector Review and column dimensions Alahtat.
4. Review to install a sufficient number of cookies between the severity of the column and rebar.
5. Review places slots and routes electricity pipes.
6. Review places and levels Ohaar rebar to the threshold.
• After Altagafil and Relay:
7. Review Altagafil good Ojnab and the payment of the openings.
8. Sure level of the end of the casting and determine the height of the door of the column.
9. Review Altqoyat and install well with Altkhchib.
10. Review vertical weights.
11. Review install Altqoyat (belts) and number (3 m belts at least).

Last Update