Receipt of carpentry roofs of reinforced concrete

First, on the roof:

1. Review the external dimensions and axes match with the correct axes.
2. Review the levels and locations and heights tiles at different levels.
3. Review the dimensions and angles of the health of the ceiling tiles.
4. Review the level of intensity with the surface of Alruper and ensure conformity to the level of abdominal surface.
5. Review dimensions and heights fall beams.
6. Review aspects of the vertical beams.
7. Review the external aspects of height and roof tiles Tkhanat.
8. Review the fall of the bathroom tiles on the level of the rest of the tiles.
9. Review of payment between the panels the application and some of them:
- Between the beams meet Ojnab with the application of the ceiling.
- At the confluence of beams with each other and with the columns.
- Between the bottom and Ojnab beams.
10. Review places and dimensions of openings electricity / health / air conditioning / other .. etc..
11. Review places to install bolts or pallet and make sure to install a well.

Second, under the roof:

12. Review Lists (veins) and the distances between them.
13. Review places arrived with some of the veins in the case of high altitudes and to ensure the durability of reinforcement at the joints.
14. Review the quality of bands install beams and roof slab.
15. Review the work of Tqoyat intensity Barouk slash (Nhays) in both directions and install Baalghemt well with intensity and with the veins of the columns or walls castings.
16. Review the bottom of the beams to strengthen Barouk (locked) with clamp.
17. Review and strengthen the necks of the columns to ensure the safety of the payment to ensure the absence of concrete after the growths of the jaw.
18. Review strengthen aspects of the beams's Foreign Bashkalat well in the veins cantilever (Eskandarani) and install Bashmbr in the application of the ceiling.
19. Review Altqoyat connection plates at each application and make sure links work properly.