Stages and the basic rules - Phase Executive 1

Conservation and documentation of the project:
Engineer to prepare the files necessary to save the project documents to keep them from damage and ready reference at any time during the project, and to be saved according to the sequence of sound and accessible manner.
Is saved as any correspondence (or copies thereof) is between the employer and the contractor, as well as between the contractor and supervision, and also plans are saved for the project in a way reservation from damage.
Drawings WORK SHOP DRAWINGS)):
Project plans that are given to contractors to submit bids is a typical engineering plans for the project. Therefore, the contractor is required during implementation to provide detailed plans on the table as submissions are prepared on the basis of the timetable Executive approved the project, and required the following steps:
1 - Engineer required from the contractor to provide detailed operational graphics (graphics workshop) for all work in accordance with the plans and specifications for the project and all project documents.
2 - The Contractor shall fill out a form and approval of plans submitted to the supervising engineer accompanied by drawings to be approved.
3 - The engineer or the supervisor to review the plans and schemes and compliance with contract documents and shall be in a review of coordination between the various business (Architect / Structural / Electrical / health / conditioning).
4 - take the engineer or the supervisor of one of the following:
(A) based schemes also provided without any notes.
(B) adopt plans taking into account the notes on the plans without re-rendering.
(C) based schemes, taking into account the notes on the charts with the re-introduction after the completion of the notes.
(D) are not supported for the reasons and observations of the Code.
The mind is not to exceed the duration of the proceedings, for the period provided for the contract, which is usually ten days on average.
5 - re-engineer or the supervisor to the contractor a copy of the charts with the accreditation model after choosing one of the previous procedures, as in the previous paragraph No. (4).
6 - The Contractor shall take the necessary action to re-apply if necessary.

Last Update
11/4/2011 7:39:18 PM