Stages and the basic rules - Phase Executive 5
|
Periodic report on the progress of the project:
Its main objectives:
- Statement summary information and very useful, which gives officials a brief idea on the progress of the project, and the difficulties that may face and how to overcome them.
- Helps manage periodic follow-up on the project closely.
And the engineer supervising the preparation of a technical report periodically (Form No. 5) on the progress of work includes all work performed, the work currently being implemented and the extent of quality and compliance with the specifications, and the rate of progress the work, and the percentage of elapsed time and the level of implementation, and determine the extent of the commitment of the contractor to the timetable, and the statement of any delay or provide for. Therefore, preparation of the report from the reality of the actual implementation, and be directly supervising engineer responsible for the preparation of the report and the accuracy of the recorded it.
Report on the slow pace of the contractor to perform work or to stop:
The supervising engineer - in addition to the periodic report - a special report on the project, which was moving slowly in contrast to the timetable adopted, or the project, which has stopped working on it without unjustified. And accompanied with the necessary details about the level of achievement and the causes of delay or stop, and then send it to the top and you discuss the contractor on the hard work, or remove the obstacles to progress the work, or being warned when it is not committed, or a necessary action as required by the interest of the project According to the contract.
|