2/5/14 supervision costs of delay:
Shall be in accordance with Article No. (40) of the Public Works contract, which states:
(In addition to the fine provided for in Article (39) required the contractor to bear the fees of the supervisor of the implementation of the project during the subordination of the contractor of the fine, and calculated the fees on the basis required by the contract supervisor if the amount of a periodic or a percentage of the value of the Contract. If the supervision of a lump sum or used to be by the government; the supervisor's fees are calculated as follows:
1 Duration per day delay
Contract value × ×).
100 day duration of the contract
2/5/15 fine non-existence of members of the technical staff of the contractor:
Apply the fine in accordance with the provisions of the contract with the contractor and required by the nature of the work of the formation of System technical, in the case of non-existence of the technical staff required or the absence of some of its members is the discount for each day absent in which a member of the technical charge of managing and monitoring the implementation of the work site as provided for the contract.
|
Last Update
11/4/2011 7:23:02 PM
|
|
|