edures manual to oversee the implementation of projects - Definitions 5
|
42 - is the change:
A written order approved by the authority directed to the contractor on a dramatic change and is necessary for some items and business project.
43 - this extract:
Receipt of periodic payments to the contractor for work done and conformity to the plans and specifications and conditions, according to financial controls and administrative measures.
44 - minutes of the preview:
Minutes prepared by the supervising engineer on the day fixed for the expiration of the contract, explains the state of the project, especially in the case of non-completion, as well as work ended and the remaining work. It should be noted the work completed and utilized and the quantity and value.
45 - Receipt of primary:
Acceptance of an elementary work by the employer in accordance with the contract documents under the minutes signed by the Commission for the employer and the representative of the contractor.
46 - depending on implementation plans (AS BUILT DRAWINGS):
Charts prepared by the contractor in accordance with work carried out on the ground, and by the end of the project.
47 - operation and maintenance manuals and diagrams Services by implementation:
The Contractor shall submit a complete copy of the operating and maintenance manuals and diagrams as implementation services include the following:
- A general plan by the implementation of the service networks (water - air conditioning - Fire - exchange) shows piping, valves and control devices and equipment.
- Implementation of the plans as extensions of electrical and control.
- Relay control, explaining the process of startup and shutdown work.
- Technical bulletins, photos, illustrations, manufacturer's data.
- Operating and maintenance instructions for each unit of hardware.
- A list of spare parts and numbers.
|