Receipt of building works
|
A: Guidelines for the implementation of building works:
1. Is the work of a fixed horizontal level (drink) and education on concrete columns before you start the building works.
2. Is monitored mixing ratios of mortar buildings.
3. Course work is a land full role or unit with: -
3-1 - quadrisection rooms.
3-2 - to locate the holes.
3-3 - Weight buildings down beams.
4. Bricks are placed (first course) on a mattress full of mortar.
5. Templates are used properly on a permanent basis and make sure not to use fractions of templates in the construction as possible.
6. Madamik installment is on high walls so that they are all equal, as well as Madamik Aerames.
7. Have to rise the walls of the building regularly so as not to rise more than any other part of more than 1.5 m at any time, and ends with another course in the level of gastropods Almidat and floor slabs and the thresholds and do not use parts of the bricks.
8. Must be unloaded by Aerames of 1-2 cm-go in order to help the cohesion of the white or Kahla.
9. Aerames sprayed with water after unloading and then Aerames Tekhal Bmona.
10. Kahla must work from the top of the wall to the bottom longitudinal Aerames private.
11. In the case of hollow building brick and pumice are Work 3 building blocks of solid bricks above and below the slab, as well as the work of the armed Mdemaqin in the lintel level of solid brick and also around the openings of windows and doors.
12. In the case of half brick wall build concrete column next to the simulated size not less than 20 cm If you say about that size must be simulated with the casting of the column.
13. Thread is used to review the balance of vertical walls of all three building blocks.
14. In the case of buildings, retaining walls, brick hollow iron rods are placed vertically on the horizontal distances 1.2 m and is filled with blocks of iron rods passing through the cement mortar.
B: Guidelines receipt of the buildings
1. Not use damaged masonry units.
2. Aerames filled the longitudinal and transverse.
3. Is the use of "Kdh" long aluminum 3.00 meters in all directions to review the baked surface and ensure that there Terbaat in white.
4. Thickness of the vertical and horizontal seams no more than 2 cm.
5. Must discharge welders whiteness buildings which will be about 1 cm in depth.
6. Review Chhat buildings.
7. Partitions linking buildings with concrete columns Boukos displayed not less than 2.5 cm (Kanat).
8. Splashes are the columns after the jaw and fully processed and before the construction of walls adjacent sufficiently enough to Tsald splash.
9. Installment is sure rise buildings so there is no break of more than 1 cm between the last stone buildings and gastropods beams or floor slabs.
|