Steps to oversee the implementation of projects- buildings 4
|
Insulation (the order of these actions is subject to the opinion of the supervising engineer).
Isolate the humidity:
1 - Adoption of samples of materials to specifications.
2 - Verification of material supplied to the site in accordance with the approved samples.
3 - Check the cleanliness of the surfaces that will be installed insulating layers of moisture on them.
4 - Verification of the installation of insulating layers as directed by the manufacturer, according to the technical assets with particular attention to the implementation of links.
5 - overseeing the testing required for insulation layers according to the specifications and then received.
Thermal Insulation:
1 - Adoption of samples of materials to specifications.
2 - Verification of material supplied to the site in accordance with the approved samples.
3 - Verification of the installation of the insulating layer of heat as directed by the manufacturer, according to the technical assets with the care of it.
4 - Receive the insulating layer of heat.
5 - to give permission for heat-insulating layer in accordance with the plans and specifications.
Sound insulation:
1 - Adoption of samples of materials to specifications.
2 - Verification of material supplied to the site in accordance with the approved samples.
3 - Verification of the installation of sound-insulating materials as directed by the manufacturer and then received.
Of the filler:
1 - Review electrical wiring, ceilings and walls to ensure their completion.
2 - check wiring and connections and make sure the health of isolated and tested.
3 - Review the installation frames (Lhalouk) for doors, windows and vents.
4 - Adoption of filler mix.
5 - to receive the work Albaj and tendons.
6 - to give permission to begin the work of the filler.
7 - overseeing the implementation phases of filler (splashes / lining / Dharh) and the adoption of each stage.
8 - receipt of the filler according to the plans and specifications.
9 - Verification of water treatment for the period specified in accordance with the specifications.
|