Receipt The work of blank interfaces
|
First, back splash and Albaj:
1. Strict hygiene is to make sure the walls of the interfaces.
2. Should spray the front Rasha thickly with water before the start of the splash and make sure before the splash of the installed segments of nets stretched display (10-15 cm) between any component of concrete and buildings, so that half of proof on the concrete and the other buildings in order to resist the expansion and contraction caused by changes in temperature and humidity .
3. Make sure to match the proportions of the components used Plash specifications.
4. To ensure complete safety of the scaffold on the interface.
5. Ensure that there are plastic curtains or the like when you are working the streets of public or residential areas.
6. Make sure to install the throats of all the interface and also make sure to receive it.
7. Ensure the completion of the work of health and electrical work on the interface.
8. Make sure all the chopping of the prominent iron beams, scaffolding, roof and columns.
9. At least half the thickness of the Plash cm.
10. Mortar paste Plash be coherent and not a liquid and sprayed machine vertical or tossing the strong walls.
11. The lack of homogeneity of thieves and back splash.
12. Make sure that the surface rough splash and tapered to accept the coherence of the lining layer.
13. Water is sprayed in the morning and evening for at least two days.
14. Baj is the work of the interface at distances of not more than 2 m in horizontal and vertical directions.
15. Make sure to adjust the Alsoai of the interface.
16. If there were weapons or the like must quadrisection Albaj own or work Varmh own.
17. Are broken down Albaj after completion of the lining and fill the place.
Second: Lining:
1. Decline rates of the components of white mortar lining in accordance with the percentages in the technical specifications for the project.
2. Thickness of not more than blank walls of 2.5 cm and not more than the thickness of egg Bishop of 1.5 cm.
3. Tdra Bakdh lining in three directions (horizontal / vertical / country), making sure Planer straightedging and cleanliness.
4. Make sure there are no spaces between the straightedging and white.
5. Are afraid Balbrooh surface after the completion of the shield-edge in the case of blank roughing In the case of lining dry before combing the lining according to the type Aldharh it.
6. Dry before combing the interface depending on the type Aldharh it.
7. Sessions must be completed and illiterate whites, weapons and so on and ensure quality.
8. Lining must be sprayed with water for at least 3 days.
9. Password must be on the lining of the interface to check on the quality and the lack of tattoo, or numbness, and so on.
Second: Aldharh:
1. Are Aldharh by color and type approved.
2. Clean tubes, the health effects of Aldharh.
|