Steps to oversee the implementation of a mechanical 4

Elevators:
- Review the dimensions of shaft and check for sufficient space for installation and maintenance.
- Audit of the link structure of construction and installation of the building.
- Check that the slide rails for elevators and vertical parallel walls and installed a good lift.
- Verify the symmetry of the order of clashes in the bottom of the well under the vehicle so as not to touch the emerging emerging vehicle during operation.
- Review equipment and security precautions and safety.
- Matching the dimensions of the emerging plans and specifications.
- Review the machinery room combinations according to the manufacturer's instructions.
- Create a special environment for machine room according to the manufacturer's recommendations.
Tests:
- Came to be in accordance with Part IV on the tests.
System of fountains:
- The piping and installation of devices according to the charts.
- Check out the barrels of water to yield the desired shape of the path of the water out of them.
Tests:
- Runs the fountain for a period of not less than 24 hours and preview the efficient operation of all equipment and control devices, as well as matching with the results of operating conditions and specifications.

Last Update
11/5/2011 4:22:49 AM