Steps to oversee the implementation of a mechanical 4
|
Elevators:
- Review the dimensions of shaft and check for sufficient space for installation and maintenance.
- Audit of the link structure of construction and installation of the building.
- Check that the slide rails for elevators and vertical parallel walls and installed a good lift.
- Verify the symmetry of the order of clashes in the bottom of the well under the vehicle so as not to touch the emerging emerging vehicle during operation.
- Review equipment and security precautions and safety.
- Matching the dimensions of the emerging plans and specifications.
- Review the machinery room combinations according to the manufacturer's instructions.
- Create a special environment for machine room according to the manufacturer's recommendations.
Tests:
- Came to be in accordance with Part IV on the tests.
System of fountains:
- The piping and installation of devices according to the charts.
- Check out the barrels of water to yield the desired shape of the path of the water out of them.
Tests:
- Runs the fountain for a period of not less than 24 hours and preview the efficient operation of all equipment and control devices, as well as matching with the results of operating conditions and specifications.
|