Instructions the work of receipt The work of insulation moisture
|
1. Ensure the cleanliness of concrete surfaces to be isolated from dust and soft materials.
2. Make sure that there is no tag or metal chamber in the surface of the concrete.
3. Make sure the work of the mortar at the confluence of a triangle with the wall tiles surfaces.
4. Make sure the work overalls and a height of not less than 20 cm.
5. Make sure there are no slots or holes in the layers of burlap Almoktrn.
6. Make sure that the burlap completely saturated with bitumen.
7. Ascertain the number of layers of burlap and bitumen layers of burlap and passes with each other.
|