The work of general location 2

Reclamation:
- The adoption of structural backfill material in accordance with the specifications.
- Test your blood layer filling the bottom of the bedding under the pipe in accordance with the plans 0
- Is to bridge the pipes after the testing of pipes and accessories, and complete the work of protection required.
- The statement in a landfill and equipment used in compacted according to specifications.
- Verification of any decline in the backfill layer during the maintenance period after receipt of the project is appealable.
Concrete works:
- Adoption of the drawings.
- The adoption of methods and materials processing defects concrete surfaces after removal of formwork.
- Ensure the efficiency of mechanical shakers used for blood concrete.
- Adoption of a number and locations of construction joints before pouring concrete.
- Adoption of the qualities and components of the concrete mix in accordance with the specifications.
- Review the status of the water seal in accordance with the plans and protect it well before pouring concrete, and as recommended by the manufacturer.
- Make sure to re-paint surfaces wrenches when used again with materials certified according to the specifications.
- Take the necessary precautions for the lack of separation between the components of concrete during the casting stages.
- Control of substances added to the concrete during mixing when you need to modify the properties of concrete mixture according to the specifications.
- The adoption of the period of time between pouring concrete and remove formwork.
- Take necessary precautions to prevent concrete from the effects of damage and freezing temperatures and high temperatures.
- Examination of tanks and manholes and ensure there are no cracks and the cracks and retaining water without any leakage in accordance with the specifications.