Backup diesel generator:
- Revision of the generator of credit cards and match data installed stomach.
- Review the components of the generator is in accordance with the specifications.
- Review technical information and operating conditions and test certificates of the plant.
- Review the base-born and sewer cables and vibration isolators and method of installation.
Tests:
- According to the fourth part of your tests.
Fuel tanks:
- Verification of the capacity of fuel tanks or ground daily in accordance with the specifications.
- Examination of tanks installed before according to the manufacturer's instructions.
- Verification of the installation of the tank and ground daily in place and put it right.
- Check all connections for the tank and revised drawings 0
- Review the dimensions of all openings.
- Review the performance of fuel pumps for the primary and backup fuel tank daily.
Tests:
- Is the work test failure and leakage tests mentioned specifications.